The Suez Canal Corridor Area Project Arabic: مشروع تطوير محور قناة السويس‎‎ is a mega project in Egypt that was launched on 5 August 2014 by president Abdel Fattah el-Sisi The project's aim is to increase the role of the Suez Canal region in international trading and to develop the three canal cities: Suez, Ismailia, and Port Said

The project involves building a new city new Ismailia city, an industrial zone, fish farms, completing the technology valley, building seven new tunnels between Sinai and Ismailia and Port Said, improving five existing ports, and digging a new canal parallel to the Suez Canal The new canal will increase the canal capacity by allowing ships to sail into both directions at the same time for a greater proportion of the canal The project will transfer the canal cities into an important trading center globally It will also build new centers on the Suez Canal for logistic and ship services

el-Sisi announced that the new Suez Canal project will operate after a year instead of three years The project's authority said that the revenues of the canal will increase from 5 billion dollars to 125 billion dollars yearly The new Suez Canal and the seven tunnels are under construction simultaneously Construction of the rest of the projects which include building the city, industrial zone, technology valley, and fish farms will begin in February 2015

The project is also known as "The Great Egyptian Dream" because it will help the economy of Egypt reheal after many years of unrest and corruption

The Egyptian Armed Forces participate in the project by helping in designing and digging the canal and the tunnels It also protects the project's location from terrorists in Sinai

Contents

  • 1 History
  • 2 Projects
    • 21 New Suez Canal
    • 22 Seven new tunnels
    • 23 Floating bridge
    • 24 Technology Valley
    • 25 Industrial Zone
    • 26 New Ismailia City
    • 27 Fish Farming
    • 28 Russian Industrial Zone
  • 3 Developing Existing Ports
    • 31 Western Port-said Port
    • 32 Eastern Port-said Port
    • 33 El-Sokhna Port
    • 34 Arish Port
    • 35 El-Adabiya Port
  • 4 Notes
  • 5 References
  • 6 External links

Historyedit

The Suez Canal Corridor Developing Project dates back to 1970s when Hassaballah El Kafrawy former Minister of Housing proposed the project to President Anwar al Sadat, but due to problems, the project didn't start He proposed the project again to Hosni Mubarak in the 1990s but it did not work either Engineer Hassaballah El Kafrawy sought to turn the canal corridor into an important international region rather than just a passageway for ships

In 2008, the former Minister of Transportation Mohamed Mansour again proposed the project However, the Egyptian government again did not take any serious steps to start the project

In 2012, the Muslim Brotherhood introduced a development project for the Suez Canal region during the presidential elections In 2013, Prime Minister Hesham Qandil began studying the project and announced that the government would begin to plan for the project

Projectsedit

New Suez Canaledit

Old and New Suez Canal aerial

The New Suez Canal is the name of an under-construction artificial waterway project in Egypt, creating a second shipping lane along part of the Suez Canal Also, other parts of the Suez Canal will be deepened and widened The project was inaugurated by the Chairman of the Suez Canal Authority Mohab Mamish in the presence of Egyptian President Abdel Fattah el-Sisi on 5 August 20141

The New Suez Canal is expected to expand trade along the fastest shipping route between Europe and Asia The new canal will allow ships to sail to both directions in the same time This will decrease waiting hours from 18 to 11 hours for most shipsthe expansion was expected to double the capacity of the Suez Canal from 49 to 97 ships a day1

The New Suez Canal will be 72 km 45 mi long, including 35 km 22 mi of dry digging, and 37 km 23 mi of "expansion and deep digging" The construction, which was scheduled to take three years, was instead ordered by the President to be completed in a year The chairman of the Suez Canal Authority announced that the revenues from the Suez Canal after the completion of the New Suez Canal will jump from 5 billion dollars to 125 billion dollars annually The Egyptian government said that these revenues will be used to transform the cities along the Canal Ismaïlia, Suez, and Port Said into international trading centers The government has also said that many new projects in the Suez province are being studied as a result of enlarging the Suez Canal capacity, such as building a new industrial zone, fish farms, and the completion of the valley of technology wadi al thechnologia

The project cost around 30 billion Egyptian pounds and no foreign investors were allowed to invest in the project, but rather Egyptians were urged to participate in funding the project through a stock market After President Sisi announced the new megaproject, Egypt's stocks rose to the highest level in the past six yearscitation needed

The Egyptian Armed Forces participates in the project by helping in digging and designing the canalcitation needed

Seven new tunnelsedit

The chairman of the Suez Canal authority announced that seven new tunnels will be dug to connect the Sinai Peninsula to the Egyptian homeland Three tunnels will be dug in Port Said two for cars and one for railways and four will be dug in Ismaïlia two for cars, one for railways, and one for other special uses

The tunnels will cost 42 billion dollars approximately about 30 billion Egyptian pounds The first three tunnels will cost 18 billion Egyptian pounds and 2 Arab Contractors and Orascom are the builders for this project3 The Armed Forces Engineering Authority are normally tasked with infrastructure projects and will help with digging the tunnelscitation needed

Floating bridgeedit

The Al-Nasr floating bridge to enable people to easily travel back and forth between Port Said and Port Fouad was built successfully and inaugurated in late 2016 The bridge extends from opposite banks, with the help of tugboats that push both parts until they connect to form a bridge that can be traversed by cars It is 420 meters long45 This was an important step towards the efficient movement of equipment and manpower6

Technology Valleyedit

The technology valley is an old project that has stopped for about 17 years and now the government announced to re-continue the project The project's location lies on the eastern part of Ismaïlia city and consists of four stages: the first stage covers 3021 acres, the second stage covers 4082 acres, the third stage covers 4837 acres, and the fourth stage covers 4160 acres However, before seventeen years when the project started it completed only 108 acres and then stopped for seventeen years

The technology valley will be the first step in starting Egypt's electronics industry for manufacturing technological devices

Industrial Zoneedit

This project will cover 910 acres of land north west of gulf of Suez The first stage of the project covers 132 acres and it is done with a cost of 20 million Egyptian pounds The second stage is 132 acres and it is not yet done Currently there are 23 factories operating and 56 still under construction upon finishing the project it will provide 9386 work opportunities

The chairman of the Suez Canal authority announced that the government will build eighteen new factories in the industrial zone which will include: glass factory, car assembling factory, electronics factory, medicines factory, textiles factory, furniture factory, paper factory, sugar factory, food factory, petrochemicals factory, petrol refining factory, light metal manufacturing factory, and a minerals factorycitation needed

The chairman of the Suez Canal authority also said that ship factories and services will be built among the Suez Canal corridor which includes: catering and services center for ships, ship manufacturing and repair center, a center for manufacturing and repairing containers, and logistic redistribution centers7

New Ismailia Cityedit

This project will create "New Ismailia City", which will cover 16500 acres of land This new city will be created to accommodate approximately 500,000 Egyptians in order to relieve the pressure from the crowded towns of Cairo and the delta cities The location of this city is designed to accommodate the workers of the nearby Wadi Al-technologiya Technology Valley which will be built in following years

Fish Farmingedit

The National Project for Fish Farming, new fish farms were built on the eastern side of the Suez Canal The project includes twenty three tanks that cover 120  square km with depth of 3-5m It covers the area from southern Tafrea to the gulf of Suez This project is designed to produce high quality fish food The project included the building of solar panels that produce Up to 2500 megawatts and reform 400,000 acres of land in northern Sinai into farming land using the El Salam Canal89

Russian Industrial Zoneedit

During a state visit to Russia, President Sisi said that he had agreed with his Russian counterpart President Vladimir Putin to establish a Russian industrial zone in the new project However, no more information was given about the project So the Russian industrial zone is still a proposed project with no studies so far

Developing Existing Portsedit

Western Port-said Portedit

Western Port-said Port lies on the northern entrance of the Suez Canal and is considered one of the most important ports in Egypt because of its location on the entrance of the Suez Canal

The port covers an area of 29 square km the land area is 12 square km and the remaining 17 square km is water area The port contains 37 docks which includes docks for passengers, yachts, and general goods The port is divided into stations and each station contains a number of docks with its own working area that includes repairing centers, equipment center, and stores The maximum capacity of the port is 12 million tons yearly

Eastern Port-said Portedit

Eastern Port-said Port lies on the north western entrance of the Suez Canal branch which is a unique location because it connects 3 continents The design of the port is geometrically ideal The port was built in 2004 to serve international trading and act as a transit center between the continents

The port borders the Mediterranean Sea from the north, the industrial zone from the south, the salty lakes from the east, and the Suez Canal branch from the west The port covers an area of 35 square km

The port authority plans to build docks the will reach 12 km long and an industrial zone south of the port covering 78 square km Three stages are still remaining to fully complete and improve the port:

  • Stage one is creating 8 stations with docks 8 km long
  • Stage two is creating 15 station with docks 16 km long
  • Stage three is creating 21 stations with docks 25 km long

El-Sokhna Portedit

El-Sokhna Port lies on the southern entrance of the Suez Canal

The port's total size is 24,919,33785 square m:

  • 3,400,000 square m is the water area
  • 21,519,337 square m is the land area
  • 1,000,000 square m is the Customs center
  • The largest dock's size is 7 km long and 55 km wide

In 2008, an Emirati company bought the port and announced the plan to build a new 13 km dock to work with more than 1 million containers yearly It also said that a general goods center will be builtcitation needed

The port serves the oil and gas fields in the region It exports products from the petrochemicals and refining factories in Ein al Sokhna region It also exports the products of a ceramic factory, ammonia factory, and a sugar factory

Arish Portedit

Arish Port lies on the Mediterranean Sea on the northern coast of Arish city in 1996 the port was transformed from a fishing port to a trading ships port

The port contains a dock which is 242m long that can serve huge ships There is another dock which is 122m long that serves smaller ships The port also includes covered storage areas which cover 2  square km and non-covered storage areas which cover more than 27  square km On 5 June 2014 the port was no longer controlled by the Port Said port authority, the Ministry of Defence took control of it due to its sensitive location The port contains a lighthouse that can be seen from up to 18 miles The main importance of the port is that it exports Sinai products to the Mediterranean countries

New projects:

  • Build a 2 km dock which will include containers station and a general goods station
  • Build new storage areas
  • Build a dock for yachts
  • Build new logistic centers

El-Adabiya Portedit

El-Adabiya Port lies on the western side of the Suez Canal, about 17 km from Suez city The Red Sea Ports Authority in Egypt controls the port

El-Adabiya Port consists of 9 docks which reach 1840m long and 42–27 foot deep the water area is about 158  square km which is also shared with the Suez Canal port and Petroleum Dock port and the land area is 08  square km The maximum carrying capacity of the port reaches 67 million tons yearly

In 2014, the Suez Canal Corridor Project Authority announced that El-Adabiya Port will be improved after the completion of the new Suez Canal to serve more shipscitation needed

Notesedit

All information is from Rose al-Yūsuf magazine

Referencesedit

  1. ^ a b "Egypt launches Suez Canal expansion" BBC August 6, 2015 
  2. ^ "Arab Contractors, Orascom to compete three tunnels in Suez Canal 2018-end" Hellenic Shipping News 
  3. ^ "Egypt tunnel project commencing" World Highways Retrieved October 3, 2016 
  4. ^ "Egypt’s local news digest Sept 16: Floating bridge in north-eastern of Egypt to be inaugurate in December- official" Cairo Post September 16, 2016 
  5. ^ "Egypt's Sisi hails anti-corruption measures, calls for more" Ahram Online December 28, 2016 
  6. ^ Girgis, Adel December 24, 2016 "Bridge development between Port Said and Sinai" in Arabic Rosa Magazine 
  7. ^ "Sisi slams 'doubters', says New Suez Canal a success" Ahram Online August 6, 2016 
  8. ^ Al-Aees, Shaimaa July 26, 2015 "460 fish farming ponds to be established in Suez Canal" Daily News Egypt 
  9. ^ Samir, Mohamed December 28, 2016 "Al-Sisi asks citizens to endure 6 months of hardship" Daily News Egypt 

External linksedit

  • Rose al-Yūsuf magazine

suez canal area development project management, suez canal area development project monitoring, suez canal area development project proposal, suez canal area development projects


Suez Canal Area Development Project Information about

Suez Canal Area Development Project


  • user icon

    Suez Canal Area Development Project beatiful post thanks!

    29.10.2014


Suez Canal Area Development Project
Suez Canal Area Development Project
Suez Canal Area Development Project viewing the topic.
Suez Canal Area Development Project what, Suez Canal Area Development Project who, Suez Canal Area Development Project explanation

There are excerpts from wikipedia on this article and video

Random Posts

Body politic

Body politic

The body politic is a metaphor that regards a nation as a corporate entity,2 likened to a human body...
Kakamega

Kakamega

Kakamega is a town in western Kenya lying about 30 km north of the Equator It is the headquarte...
Academic year

Academic year

An academic year is a period of time which schools, colleges and universities use to measure a quant...
Lucrezia Borgia

Lucrezia Borgia

Lucrezia Borgia Italian pronunciation: luˈkrɛttsja ˈbɔrdʒa; Valencian: Lucrècia Borja luˈkrɛsia...